Project Name Client Period Purview
Boryeong #1~8 Coal Handling System(BC,Tower) Hyundai Rotem 2014.09.30~ Present - Detail Design & B/M Estimate
- Documentation for Detail Design /
Fabrication
Boryeong #1~8 Coal Handling System(ASBC) Hyundai Rotem 2014.09.30~ Present - Detail Design & B/M Estimate
- Documentation for Detail Design /
Fabrication
Buk-Pyeong Unit 1,2 Small Hydro Power Gumsung E&C 2013.02.13~ 2013.05.31 - Technical Evaluation
- Design & B/M Estimate
Needle/Pitch Coke Shipping Facility POSCO
(Gwang-Yang)
2013.05.28~ 2014.09.30 - Basic & Detail Design, B/M Estimate
- Documentation for Detail Design /
Fabrication /Erection / Commssioning
Shredding Plant Supply Fujicar (Japan) 2013.01.03~ 2013.05.25 - Detail Design & B/M Estimate
- Documentation for Detail Design /
Fabrication
Shin boryeong Power #1,2 Coal Handling System(ASBC) Hyundai Rotem 2012.12.26~ Present - Calculation for Technical data
- Design & B/M Estimate
Shin boryeong Power #1,2 Coal Handling System(B/C) Hyundai Rotem 2012.12.26~ Present - Calculation for Technical data
- Design & B/M Estimate
Samcheok Green Power #1,2 Coal Handling System Samsung Heavy
Industry
2012.12.06~ 2014.08.31 - Detail Design & B/M Estimate
Shin boryeong Power #1,2 Coal Handling System Samsung Heavy
Industry
2012.07.31~ 2012.12.26 - Calculation for Technical data
- Design & B/M Estimate
Coal Handling System for Taean Unit 9,10 and IGCC Samsung Heavy
Industry
2012.07.31~ 2012.12.15 - Calculation for Technical data
- Design & B/M Estimate
Hadong Thermal Power 2nd Coal Storage System Samsung Heavy
Industry
2012.05.01~ 2012.11.23 - Calculation for Technical data
- Design & B/M Estimate
Coal Storage Silo System for Talin Power Plant Renewal Project Midas IT 2012.05.01~ 2012.07.31 - Calculation for Technical data
- Design & B/M Estimate
Extension Construction of Wood Pellet Line for Nongheyop Feed Eunsung Plant 2012.02.13~ 2012.05.31 - Design & B/M Estimate
Extension Construction of Material Silo and Bulk Bin for Bukukhyeop Feed Eunsung Plant 2011.10.06~ 2012.04.20 - Design, Fabrication & Delivery
- Chain C/V W450 x 25M w/ Silo and
Steel Structure
Belt Conveyor BW900 x 320mL, Belt Conveyor BW900 x 157mL ILSHIN 2011.06.15~ 2011.11.15 - Fabrication & Delivery
Dangjin #9,10 Coal Handling System Samsung Heavy
Industry
2011.09.06~ 2012.01.31 - Design & B/M Estimate
Samcheok Green Power #1,2 Coal Handling System Samsung Heavy
Industry
2011.05.24~ 2012.07.31 - Design & B/M Estimate
Harbor Equipment for Kalimantan, Indonesia Midas IT 2011.03.02~ 2011.03.31 - Design of Lay Out / Design of Jetty
- Technical Specification and Data
Material Treatment Equipment for Nickel Plant Midas IT 2011.03.02~ 2011.03.31 - Design of Lay Out
- Design of Kiln GA
Blending Bin Equipment for Boryeong Thermal Power Unit 3~6 Midas IT 2011.02.02~ 2011.03.31 - Design & B/M Estimate
BOP of TAKAKAR Thermal Power, Indonesia Midas IT 2011.03.02~ 2011.03.31 - Design & B/M Estimate
Piping system for Cotton Cellulose Production Equipment with 20,000 t/h Daewoo
International
2011.03.31~ 2011.04.15 - Design for Piping
- Fabrication & Delivery(FOB)
Youngheung #5,6 Coal Handling System Midas IT 2011.03.02 ~ 2011.05.23 - Design & B/M Estimate